DIRECTIONS TO KLMBH BASH #317 @ BUKIT BERUNTUNG, SUNDAY 6TH JULY 2025
- bashweb
- Jun 27
- 2 min read

Date: 6th July 2025
Time: Briefing 9:15am sharp, ride begins immediately post briefing
Location: Bukit Beruntung, Selangor
Address: Kuil Sri Vel Murugan, Bukit Beruntung (Google Maps)
Short Ride:
Starting off with double track along the Selangor River (Sg. Selangor) with some scenic routes. There will be some palm oil estate, natural forest, and bluish ponds where indigenous people conduct their fishing activites.
The short loop will be approximately 19Km with an elevation gain of 350M and its kids friendly. Initially the Selangor River will be on the left and after crossing the bridge, the river will be on the right along the way till the very first left turn into the natural forest.
Once into the natural trail, this is where the climb starts. It will be approximately 1Km of climb before descending down to some flowy and enjoyable single track. Rest assured it will be an experience to take home and lung refreshing ride.
Long Ride:
Estimated total distance for the long is 30Km with an elevation gain of approximately 550M. From the short/long split, there will be some climbs, single and double track. This route is a must for those who seek to improve their stamina.
This long section will go through private land and property so do expect some traffic driving along double track. Once through natural forest and palm oil estate, the reward is a breathtaking view from the top of the hills overlooking some fish farming. This area is fenced as riders will ride through a gate into private land. Ride along the fish ponds and do respect this private property and exit through the main gate. Upon crossing the last bridge, it will be back on double track heading back to home.
Important Note:
No helmet, no ride.
Bring 3 litres of water and some energy snacks.
No sweepers, if you go off-paper, you are on your own.
No littering, ensure your bike is in good and reliable condition.
Enjoy
Patrick Lew
Comentários